Thursday, 19 June 2014

Day 13 - Tiling of Walls and Waterproofing

Ah Huat finished tiling the walls and waterproofed the bathroom. 

I had mistaken that he had waterproofed the bathroom yesterday as I saw that he placed 2 sticks in the form of 'X' at the doorway to indicate 'no entry'.


Dorothy gave Ah Huat a call and asked him to create an extra inch above the doorway. She knows that I wish to place my storage heater there. I measured the heater and it was 14 inches while the space above the doorway was 16 inches. She wanted to play safe and to 'give provision' to the heater.

I appreciate her thoughtfulness.

In the meantime, the tiles above are taped with masking tape to hold them in place.

The view from outside the bathroom

No comments:

Post a Comment

A firm believer of 'you don't have to be rude to put across your message', I love, and welcome, all comments. Do remember to leave your name behind though, it feels kinda weird to start a reply with 'Hi Anonymous'. With that, thanks for stepping into my attic and sharing my thoughts.